Construction of an Ablution Block at Shamapene Roadside Market
The solar water reticulation system supplements the construction of the ablution block to ensure availability of Water, Sanitation and Hygiene at the market. The facility was drilled and installed at a cost of K296, 943. Besides servicing the market, the water reticulation system will also have taps to service nearby villages. The project is 100 percent complete and in use.
coordinates
GPS Location Longitude
25.17484869
GPS Location Latitude
-14.84558531
Construction of an Ablution Block at Shamapene Roadside Market
The construction of an Ablution Block at Shamapene Roadside Market is at slab level.
Once complete, the facility will make the market conducive for trading.
coordinates
GPS Location Longitude
25.17474777
GPS Location Latitude
-14.8455130
Rehabilitation of the Kandende Bridge
The rehabilitatation of Kandende Bridge along the 6.5Km Kandende-Shamapene Road in Munkuye Ward is at 100 percent and ready for use. The ZDSP funded project was rehabilitated at a of K1,330,953.
The bridge will save as a key link for hundreds of residents in Kandende area and beyond who connect to the Mongu-Lusaka Road.
Kandende area hosts a clinc and schools whose administrators faced challenges to connect to the Mongu-Lusaka Road for additional services as the area become cut off during the rain season.
coordinates
GPS Location Longitude
25.20755320
GPS Location Latitude
-14.82985011
Construction of a Water Reticulation System at the Slaughter Slab
The solar water reticulation system supplements the construction of the ablution block to ensure availabity of Water, Sanitation and Hygiene at the slaughter slab.
Drilled and installed at a cost of K350, 000, the project is 100 percent complete and in use. Notably the system sits on an artessian well which flows naturally from the ground and is providing water for aninamls and nearby communities.
coordinates
GPS Location Longitude
25.16745686
GPS Location Latitude
-14.86427673
Construction of an Ablution Block at the Slaughter Slab
The K250,000 ablution block at the slaughter slab is at roofing level.
Once complete, the facility will service hundreds of traders expected to be using the facility.
coordinates
GPS Location Longitude
25.16752984
GPS Location Latitude
-14.86411697
Nkeyema Town Council,
P.O. Box 940221,
Western Province,
Zambia.
M 9 Lusaka – Mongu Road